Tiled roofing for contractors: agree interfaces, programme, material approvals and evidence for handover before the roof is opened.
Define the interfaces in the scope
Identify who is responsible for scaffolding, lifting, waste, temporary protection, timber repairs and interior finishes. Separate the roofer’s work from the window installer, insulation contractor and solar electrician. At party walls, dormers and extensions, agree a detail showing where each trade’s responsibility starts and ends. Record who can approve a change in material or additional work.
Plan from confirmed materials and access
Provide the roof survey, drawings, measured areas and proposed tile schedule. Confirm model, colour, accessories and delivery sequence before fixing the roof-opening date. Discuss working space, storage, occupied buildings and weather protection for each phase. If a product is unavailable, check the technical consequences of an alternative before it reaches the site.
Agree inspection hold points and handover
Useful checkpoints include repaired timber, insulation continuity, airtightness and underlay connections before subsequent layers hide them. Agree which photographs and product records the principal contractor needs. At handover, list completed areas, approved variations, remaining defects and responsibility for follow-up. Supply maintenance information and distinguish product warranties from the roofing workmanship agreement.
Continue with this topic
10 years of warranty on our work
We provide a 10-year warranty on our tiled roof work. The written project agreement records the scope, start and applicable conditions. Product warranties are documented separately.
Read about our warranty →Explore our services
Roof tile replacement
New tiles with the right profile, colour and matching accessories for your home.
Complete roof renovation
A coordinated renovation of tiles, underlying layers and roof details.
Roof repairs and leaks
Targeted assessment and repair of defects in a tiled roof.
Ridge tiles and flashings
Careful work at ridges, hips, chimneys and wall junctions.
Roof insulation
Improve comfort with a roof build-up designed as a whole.
Roof windows and daylight
Replace an existing window or bring more daylight into your loft.
Roofing and solar panels
Coordinate the roof renovation with a new or existing solar installation.
Roof maintenance
Keep tiles, ridges, gutters and junctions in good condition.
Roof inspection
Understand the condition of your tiled roof before choosing the work.
Storm damage repair
Assess displaced tiles and damaged roof details after severe weather.
Tile battens and counter-battens
Renew the timber supporting the tiles and their ventilation space.
Roof underlay replacement
A continuous secondary drainage layer beneath the tiles.
Roof decking repair
Assess and repair the substrate beneath the roof covering.
Valley gutter work
Renew or repair the drainage channel where roof slopes meet.
Gutter replacement
Match gutters and downpipes to the roof and its rainfall drainage.
Chimney roof junctions
Repair the weatherproof connection between chimney and roof.
Roof ventilation
Maintain suitable airflow within the roof build-up.
Reusing roof tiles
Preserve suitable existing tiles in a carefully assessed roof plan.